- Home
- Government
- Town Departments
- Parks, Recreation & Cultural Resources
- Parks
- Hunter Street Park
- Rodgers Family Skate Plaza
Rodgers Family Skate Plaza
Designed by Team Payne, located between and named after the 2 rail lines that run through downtown Apex, the Rodgers Family Skate Plaza is a 13,000 square foot, 4 tiered skate plaza which mimics street skating conditions and also includes competition skateboarding elements.
Amenity Details
- Location: Hunter Street Park, 1290 Ambergate Station
- Phone: (919) 249-3402
- Hours of Operation: Open 24/7
Skate Plaza Rules
Keeping safety as our first priority, the following rules apply to the use of the skate plaza:
- Town of Apex Ordinance Section 15-10 requires all persons skating or riding within the Skate Plaza to wear the following protective equipment: Protective helmet with securely fastened chin strap, Protective elbow pads, Protective knee pads
- Violations, including failure to wear the required protective equipment when skating, may result in serious bodily injury and violators may be subject to a $25.00 fine pursuant to G.S. 14-4 and/or banned from using the facility under penalty of trespass.
- Skaters 10 and under must be accompanied by an adult to use the facility.
- Only skateboards, inline skates, roller skates, and non-motorized scooters with wheels less than 5 inches in diameter are permitted. Bicycles and other similar methods of conveyance are prohibited.
- Graffiti, controlled substances of any kind, and rough play are prohibited
- Please call (919) 249-3402 with questions during normal business hours or 911 in case of an emergency.
Special Thanks
- CLH Design - skate plaza site design
- Team Pain - design and construction of skate plaza elements
- Fly-By Photography - photo and video coverage
-
Apex Community Park Nature Trail Closure
A small section of the Nature Trail at Apex Community Park will be closed for repairs on 2/25. Read on... -
Beaver Creek Greenway Closure
A section of Beaver Creek Greenway between Kelly Road and Patterson Grove will be closed 2/26 - 2/27 for bridge repairs. Read on... -
Apex Nature Park Restrooms Closed
Due to water line issues, the Nature Park/Seymour Fields restrooms will be closed until repairs are made. Read on...
History of Rodgers Family Skate Plaza
Beginnings
The story of the Rodgers Family Skate Plaza begins with a frustrated Police Captain, a group of citizens, and local skate enthusiasts who dedicated themselves to finding a suitable location for the large contingency of teens who grind, kick flip, and tail slide their way through the busy streets and sidewalks of downtown Apex each day.
Weary of telling the kids to move along and frustrated that there was no place they could go, Captain Jacques Gilbert began holding weekend skateboarding events for the kids, often drawing more than a hundred teens and adult skateboarders. Local business owner Kyle Denis of Apex Outfitters and Jeremy Johnson with I Don’t Care Ministries shared the same vision, finding a place for local skateboarders to ply their craft as a part of the community. The interest was there, the drive was there, and the critical mass was here. What was needed was a permanent home in downtown Apex where the kids could learn, teach and just hang in their own space.
Finding a Home
In the meantime, Apex Parks, Recreation and Cultural Arts Director John Brown was also grappling with a challenge. The most recent citizen park survey had ranked teen activities as the number one priority in Apex and he wanted to do something about it. He had the space at the Hunter Street Park and fellow town employee Captain Gilbert was on a mission. The next step was to get the vision on paper and mobilize everyone with the same common goal.
So, in the fall of 2013, 25 skateboarders ages 5 to 50 got together at the Community Center to draw their vision for the Apex skate plaza. A product of CLH Design, the 3D modeling of the skate plaza that you see here is a culmination of those early drawings, refined by Team Pain, professional skateboarding consultants who have been hired to make dreams become reality.
Skate Plaza Amenities
Designed by Team Payne, located between and named after the 2 rail lines that run through downtown Apex, the Rogers Family Skate Plaza is a 13,000 square foot, 4 tiered skate plaza which mimics street skating conditions and also includes competition skateboarding elements. The Mayor and the Apex Town Council unanimously and enthusiastically supported funding the initial phase of construction to build the four concrete tiers of the skate plaza. Construction began in the fall of 2014 with Rodgers Family Skate Plaza opening in 2015.