Utilities and Technology

Is the connector being planned with smart features such as accident or remote awareness cameras? 

No cameras or special crash detection technology are proposed with the project. Cameras can be added at a later date by Apex and/or NCDOT.

Will extra fiber duct be laid during the Peakway construction to ensure our future utility needs without digging up the Peakway?

An underground duct bank will be constructed along Salem Street under the bridge to accommodate both public electric service and private communication cables. Outside of that area, overhead lines are still proposed to be used in the manner they are today, and there are no additional new underground utility ducts being constructed by Apex as part of the project. 

How is electric car Infrastructure being planned for in the design? 

No electric vehicle charging infrastructure is being planned as part of the project.